Abstract

The aim of this research is to identify the corona virus as an abnormal public failure on the basis of a contractual force majeure. the author in this case uses or chooses a type of normative research based on the results obtained indirectly. The author in terms of compiling journals also uses the concept method approach. Through analysis of qualitative descriptive data and literature search, legal material collection techniques were obtained. Products obtained from research exposing, pandemic Non-natural national disaster corona virus is used as the basis for a force majeure that results in or is used as a reason for canceling an agreement. However, the corona virus pandemic can be used as a direct basis for the inability of one of the parties to fulfill obligations provided that it must prove that the inability is directly caused by the influence of the corona virus. Therefore, the corona virus pandemic can be remembered for the terms of understanding relative force majeure

Downloads

Download data is not yet available.

References

Husni Thamrin. (2018). Landasan Yuridis Gugatan Pembatalan Perjanjian Build Operate Transfer. Jurnal Ilmu Hukum The Juris II, 1.

Lathifah Hanim and MS. Noorman. (2016). Penyelesaian Perjanjian Kredit Bank Sebagai Akibat Force Majeure Karena Gempa di Yogyakarta. Jurnal Pembaharuan Hukum 3, 2.

Muhammad Habib. (2022). Keterkaitan Force Majeure Akibat COVID-19 dalam Kontrak Perjanjian. Kawan Hukum.ID.

Mustakim and Syafrida. (2020). Pandemi Covid-19 Sebagai Alasan Force Majeure Dalam Melakukan Pemutusan Hubungan Kerja di Indonesia. Salam: Jurnal Sosial Dan Budaya Syar-I, 7, No 3.

Naderipour, A., Abdul-Malek, Z., Ahmad, N. A., Kamyab, H., Ashokkumar, V., Ngamcharussrivichai, C., & Chelliapan, S. (2020). Effect of COVID-19 virus on reducing GHG emission and increasing energy generated by renewable energy sources: A brief study in Malaysian context. Environmental Technology and Innovation, 20, 101151. https://doi.org/10.1016/j.eti.2020.101151

R. Subekti. (2007). Hukum Perjanjian. Intermasa.

Rifqi Hidayat and Parman Komarudin. (2018). Tinjauan Hukum Kontrak Syariah TerhadapKetentuan Force Majeure Dalam Hukum Perdata. Syariah Jurnal Hukum Dan Pemikiran, 1.

Saurabh Sood. (n.d.). COVID-19 As a Force Majeure in Corporate Transactions. Purakala (UGC Care Journal) 31, 34, 19.

Syaiffudin, M. (2016). Hukum Kontrak Memahami Kontrak Dalam Perspektif Filsafat, Teori, Dogmatik dan Praktik Hukum (Segi Penganyaan Hukum Perikatan). CV. Mandar Maju.

Pasal 1328 Kitab Undang-Undang Hukum Perdata

Pasal 1248 Kitab Undang-Undang Hukum Perdata

Keputusan Presiden (Keppres) Nomor 12 Tahun 2020

Downloads

Published

2023-07-10

How to Cite

Firmansyah, M. A. ., & Wahyoeono, D. . (2023). TAFSIR FORCE MAJEURE TERHADAP PERISTIWA COVID-19 SEBAGAI DASAR PEMBATALAN KONTRAK BISNIS. Bureaucracy Journal : Indonesia Journal of Law and Social-Political Governance, 3(3), 2437–2449. https://doi.org/10.53363/bureau.v3i3.332