Abstract

Contractors and Employers often experience additional or reduced work, especially on EPC Projects due to the complexity of the project. Based on this, the Contractor or Employer submits a claim for the addition or revocation of the work. In practice, Contractors often experience misery related to work together with the actions of dominant Employers because there are no rules in positive law in Indonesia. This raises signs of non-compliance which is reflected in practice with the FIDIC Silver Book 2017 guidelines. This study aims to see the conformity of the implementation of verbal added-less claims on the EPC Project with the construction contract requirements in the FIDIC Silver Book 2017 with Law Number 2 of 2017 concerning Construction Services jo. Presidential Regulation Number 16 of 2018 concerning Procurement of Government Goods/Services, as well as knowing the form of legal protection for Contractors in the event of claims for work overload at the EPC Project by linking Indonesia's Positive Law with the FIDIC Silver Book 2017. This study uses a research method that has a normative legal approach and a comparative legal approach to construction claim settlement agreements. The specification of the research is descriptive analysis by providing a detailed and systematic description. Based on the research results, it can be concluded two things. First, in the terms of the FIDIC Silver Book 2017 construction contract, claims for additional work must be made in writing and are not permitted in oral form, while Law Number 2 of 2017 concerning Construction Services jo. Presidential Regulation Number 16 of 2018 concerning Government Procurement of Goods/Services does not stipulate additional or less verbal job requirements. Second, actions that can be taken to provide legal protection to Contractors listed in Article 20 of the FIDIC Silver Book 2017 which expressly provides for a claim process for additional or less work if the Contractors in this case has the right to an extension of time, settlement or additional payment, submitted within a maximum period of 28 days, whereas in Law Number 2 of 2017 concerning Construction Services jo. Presidential Regulation Number 16 of 2018 concerning Government Procurement of Goods/Services does not provide a clear form of legal protection for Contractors

Downloads

Download data is not yet available.

References

Agus B. Siswanto, dan M. Afif Salim, Manajemen Proyek Semarang : CV Pilar Nusantara, 2019.

Astri Agnes Purba, “Analisas Kontrak Proyek Konstruksi di Indonesia”, Skripsi Teknik Sipil Universitas HKBP Nommensen, Februari 2021.

Bina Konstruksi PU, “DPR RI Sahkan UU Jasa Konstruksi”, https://binakonstruksi.pu.go.id/informasi-terkini/sekretariat-direktorat-jenderal/dpr-ri-sahkan-uu-jasa-konstruksi/, diakses pada 11 Februari 2023.

Joko Cahyono, “Analisis Yuridis Undang-Undang Nomor 2 Tahun 2017 tentang Jasa Konstruksi”, Jurnal Khazanah Multidisiplin Vol. 3 No. 1 2022, hlm. 107.

Kitab Undang-Undang Hukum Perdata.

Lili Rasjidi & I.B Wyasa Putra, Hukum Sebagai Suatu Sistem, Bandung: Remaja Rosda Karya, 2003, hlm. 183. dalam Atip Latipulhayat, “Khazanah Mochtar Kusumaatmadja”, Jurnal Padjadjaran Jurnal Ilmu Hukum, Volume 1 No. 3, 2014.

MAP Lawyers, “Mengenal EPC dan Potensi Permasalahan Hukumnya”, https://manplawyers.co/2019/11/21/mengenal-epc-dan-potensi-permasalahan-hukumnya/, diakses pada 20 Maret 2023.

Nazarkhan Yasin, Mengenal Klaim Konstruksi & Penyelesaian Sengketa Konstruksi, Jakarta : Gramedia Pustaka Utama, 2004.

Peraturan Presiden No. 12 Tahun 2021 tentang Perubahan atas Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang dan Jasa.

Undang-Undang Nomor 2 Tahun 2017 Tentang Jasa Konstruksi.

Yesin, Ir. H. Nazarkhan, Kontrak Konstruksi di Indonesia, Jakarta : Gramedia Pustaka Utama, 2003.

Downloads

Published

2023-03-20

How to Cite

Ayu, D. S. ., Ikhwansyah, I. ., & Trisnamansyah, P. . (2023). STUDI PERBANDINGAN KLAIM ATAS PEKERJAAN TAMBAH KURANG PADA FIDIC SILVER BOOK 2017 DAN HUKUM POSITIF DI INDONESIA. Bureaucracy Journal : Indonesia Journal of Law and Social-Political Governance, 3(1), 1157–1170. https://doi.org/10.53363/bureau.v3i1.290